Not a remodeler, a bathroom interior designer. The layout, tile, vanity, lighting and fixtures, designed to work together and handed to the contractor you already trust.
By Julia Ginzburg, interior designer, 26 years · Updated November 2026

Bathroom interior design is the design layer of a bathroom, not the construction: the layout and flow, tile and material selection, vanity and finish, lighting, and fixtures and hardware, drawn up to work together. Julia designs the room and works with your contractor or tile setter to build it. JG Interior Design provides it in-home across Greater Philadelphia.
Which room is bugging you?
The finishing work that turns a just-renovated house into a finished home: the furniture, layout, lighting and styling planned around the space you built, on a budget that respects what you already spent.
The design layer of the kitchen: layout and flow, cabinetry color and finish, countertops, lighting and hardware, worked out alongside your contractor or cabinet maker.
Layout and flow, tile and materials, vanity and finish, lighting, fixtures and hardware, drawn up to work together. Julia designs the room and works with your contractor or tile setter to build it.
Color, furniture, window treatments, rugs, art and the styling that makes a room feel finished, working with the space as it is rather than moving walls.
A 90-minute walkthrough, room by room, that ends in a written plan of exactly what to change before you list: what to keep, remove, repair, move, or light differently, in priority order.
Julia walks your home, listens to how you live in it, and gives you a clear plan for fixing what is not working: a written, prioritized plan within 48 hours.
One room, 90 minutes in your home, a written plan in 48 hours, $350 to $500. Still not sure? Score your home in 2 minutes.
Most people looking for help with a bathroom find remodelers. They can build almost anything. What most of them will not do is decide what the finished room should look like.
The tile plan depends on the layout, the niche and the lighting. Choose it first and you usually end up reordering it, and tile is not cheap to reorder.
A floor tile, a wall tile, a shower tile, an accent and a mosaic, each appealing, add up to a room with no calm surface for the eye to rest.
If it was not planned before the walls closed, the room ends up dim or harshly lit, with no easy fix once the tile is up.
Spending on tile and then defaulting to a builder-grade vanity is the fastest way to make an expensive bathroom look ordinary.
These two words get used as if they mean the same thing, and the confusion costs people real money. A remodel is the building of the bathroom. A design is the deciding of it. You need both, but they are separate jobs, and the most common way a bathroom goes wrong is starting the building before anyone has finished the deciding.
A remodeler handles demolition, plumbing, framing, waterproofing, tile installation, and the fitting of every fixture. That is skilled, essential work, and Julia does none of it. What a remodeler generally does not do is tell you where the vanity should sit, which of forty tiles belongs on the floor versus the wall, how the lighting should be layered so the room is usable at both seven in the morning and ten at night, or which fixtures and hardware pull the whole thing together. Hand most remodelers a plan and they will build it beautifully. Hand them nothing and they will build the safest, most generic version of a bathroom, because deciding is not their job.
The design layer is that deciding. It is the difference between a bathroom that looks like it came from a plan and one that looks like it came from a showroom shelf. On a room this expensive per square foot, that difference is the whole point of hiring anyone with a designer's eye.
Most bathrooms start with a Fresh Eyes Visit. A bathroom is a stack of decisions that only work when they are made together, not one at a time at a showroom counter.
Every room starts as a drawing, and the materials are chosen in person before a single piece is bought.

A dated kitchen, finished properly

A one-of-a-kind stone piece

Space planned to the inch

Every room starts as a drawing
“Julia walked in and immediately saw what I couldn't after staring at the rooms for weeks. Her recommendations were specific, practical, and made the space feel completely different.”John Miller · More client stories
The design of a bathroom is not one choice. It is a stack of decisions that only work when they are made together, which is exactly why picking them one at a time at a showroom counter tends to produce a room that feels off without anyone being able to say why. Here is what the design layer decides.
Where the vanity, toilet, tub, and shower actually sit, and how you move between them. Bathrooms are small, so a few inches decide whether a door clears the vanity, whether two people can share the room in the morning, and whether the shower feels open or boxed in. Layout is the one decision that is nearly impossible to change once the plumbing is roughed in, which is why it is the first thing Julia plans and the most expensive thing to get wrong.
The single most overwhelming part of a bathroom for most homeowners. Floor tile, wall tile, shower tile, the niche, the accent, the grout color, and how they all relate. It is easy to choose four tiles that are each lovely and read as chaos together. The design job is picking a restrained palette that has one hero and lets the rest support it, and knowing which surfaces can carry pattern and which should stay quiet.
The vanity is the piece of furniture in the room, and it is where a bathroom either looks custom or looks catalog. The size, the finish, the counter, the sink style, the hardware, and the storage behind the doors all get decided here. Storage is the quiet part people forget until they are living without it, so the plan accounts for where things actually go.
The most neglected layer in almost every bathroom, and the fastest way a costly renovation still feels flat. A single fixture over the mirror throws shadows onto your face and leaves the room dim. Good bathroom lighting is layered: light at the mirror for the face, ambient light for the room, and often something soft for the evening. It has to be planned before the walls close, because adding a light later means opening a wall you just tiled.
Faucets, the showerhead and controls, towel bars, hooks, the mirror, and the finishes that tie them together. This is the jewelry of the bathroom, and mismatched or afterthought fixtures undo an otherwise careful room. The design decides the finish story, whether everything is one metal or a deliberate mix, so the details read as chosen rather than collected by accident.
Paint, the mirror, art, a bench or stool, textiles, and the small moves that make a bathroom feel like part of the home rather than a utility. This is the last twenty percent of a bathroom, the layer that most renovations run out of steam before reaching, and it is often the difference between a room that photographs well and one that feels finished to live in.
After years of walking into finished and half-finished bathrooms, the same handful of mistakes come up again and again. They are almost always decisions made in the wrong order or made by the wrong person.
Tile is the fun decision, so people start there. But the tile plan depends on the layout, the niche, and the lighting. Choosing it first usually means reordering it later, and tile is not cheap to reorder.
A floor tile, a wall tile, a shower tile, an accent, and a mosaic, all chosen because each was appealing, add up to a room with no calm surface for the eye to rest. Restraint is the harder and better choice.
If the lighting was not planned before the walls closed, the room will be dim or harshly lit, and there is no easy fix once the tile is up. This is the most common regret in a finished bathroom.
Spending on tile and then defaulting to a stock vanity is the fastest way to make an expensive bathroom look ordinary. The vanity carries the room.
Fixtures and hardware chosen at the last minute, in whatever finish was in stock, quietly cheapen a bathroom that was otherwise done right.
The most common arrangement Julia works in is simple: you keep your trades, she designs the room, and the two work in parallel. You may already have a contractor you trust, or a tile setter who did your neighbor's shower and did it well. There is no reason to give them up to get a designed bathroom. In fact, keeping them is usually the smarter move.
Julia designs the bathroom and hands your contractor a plan they can build from: the layout with dimensions, the tile plan showing what goes where, the vanity and counter selections, the lighting plan, and the full fixture and hardware list. A good tile setter does far better work when they are handed a clear tile plan instead of a box of tile and a vague instruction. A designer's plan makes your trades look good, and it removes the endless mid-project decisions that otherwise land on you at the worst possible moment.
She stays available while they build, so when a question comes up on site, the answer comes from the person who designed the room rather than from a guess. This is the same working relationship Julia brings to a post-renovation interior design project: design the plan, respect the trades, and keep the homeowner out of the decision storm. She does not do the construction, and that separation is a feature. You get a designer on the room and keep the builder you already trust.
Two costs get confused here constantly, so it is worth being plain. There is the cost to design the bathroom, which is what you pay Julia, and there is the cost to build it, which is what you pay your contractor, tile setter, and suppliers. The numbers below are the design layer only. Construction, tile, fixtures, and materials are separate and paid to your trades.
Most bathroom projects start with the Fresh Eyes Visit and grow only if you want the fuller service. For the full picture on fees, see what an interior designer costs.
Most bathroom projects start the same way, with one visit rather than a big commitment. Julia spends about ninety minutes in your home. She looks at the bathroom you have or the space you are planning to redesign, listens to what is frustrating you, and asks how the room actually gets used, who shares it, when it feels cramped, what the mornings are like. A bathroom is a small room with a lot of decisions in it, and naming the ones that matter is most of the value.
Within 48 hours you receive a written, prioritized plan: the layout that makes the room work, the tile direction with a clear hero rather than a pile of options, the vanity and storage approach, the lighting the room needs, and the fixtures and hardware that pull it together. It comes in an order that makes sense, so you and your contractor know what gets decided first and what can wait. If you are mid-renovation, it names the decisions you have to lock before the walls close, which is where the expensive mistakes hide.
From there the choice is yours. Many homeowners take the plan straight to their contractor or tile setter and build from it. Others bring Julia back to do the full design, source the tile and fixtures, and oversee the look while the trades handle the build. Either way you leave the first visit with a clear plan instead of a showroom full of options, and if you do not leave with clarity, you do not pay.
Start with a free 30-minute call with Julia, phone or video. It starts with one visit, not a big commitment.
About 90 minutes with the bathroom you have or the space you plan to redesign, asking who shares it, when it feels cramped, and what the mornings are like.
Layout, tile direction, vanity and storage, lighting, fixtures and hardware, in the order you and your contractor need to decide them. Mid-renovation, it names what to lock before the walls close.
From there the choice is yours. Take the plan straight to your contractor or tile setter, or bring Julia back to do the full design, source the tile and fixtures, and oversee the look while the trades build. It is the same working relationship she brings to a post-renovation interior design project: design the plan, respect the trades, and keep you out of the decision storm.
Rather talk first? Call (267) 789-1428 or send Julia a question.
Start with a free 30-minute call
| Bathroom design | Cost range | Duration |
|---|---|---|
| Fresh Eyes Visit | $350 to $500 | 90 min + 48 hr plan |
| Last 20% Package for the bathroom (design, selections, sourcing, ordering; tile, fixtures and build separate) | typically $1,500 to $5,000 | Fixed scope, quoted after the visit |
Design layer only. Construction, tile, fixtures and materials are separate and paid to your trades. For the full picture on fees, see what an interior designer costs.
Primary baths, powder rooms and full renovations in homes old and new across Greater Philadelphia, with in-home walkthroughs from the Huntingdon Valley studio.
Any bathroom where the tile, vanity and lighting decisions feel overwhelming, in the most expensive room per square foot to build.
The older housing stock here is full of tight bathrooms where a few inches decide whether the door clears the vanity. They reward a careful layout.
Newer builds are full of plain bathrooms that work but feel like a utility. They reward the finishing eye.
Keep your contractor or tile setter. Julia hands them the dimensioned layout, tile plan, vanity and lighting plan, and the full fixture list, then stays available while they build.
Bathroom interior design by area
Related design services
Areas served

Julia Ginzburg is an interior designer, not a contractor, with twenty-six years of designing rooms across Greater Philadelphia. She works from her studio in Huntingdon Valley, in person and room by room.
She does no demolition, plumbing or tile work, and that separation is the point. You get a designer's eye on the room and keep the builder you already trust. More about Julia
For the design layer alone, most bathrooms start with a Fresh Eyes Visit at $350 to $500, a walkthrough plus a written plan in 48 hours. A full design of the room, the layout, tile, vanity, lighting, and fixture selections drawn up for your contractor to build, generally runs $1,500 to $5,000 depending on the size and complexity of the bathroom. That is the design fee only. Construction, tile, and fixtures are separate and paid to your trades.
For a small powder room, often not. For a primary bath, a full renovation, or any bathroom where the tile, vanity, and lighting decisions feel overwhelming, almost always. A bathroom is the most expensive room per square foot to build and the hardest to change once it is set. The design layer is what keeps an expensive renovation from reading as builder-grade, and the plan usually pays for itself the first time it stops a wrong tile or fixture order.
Just the design. Julia is an interior designer, not a contractor. She designs the bathroom, the layout, tile, vanity, lighting, fixtures, and finishes, and hands your contractor or tile setter a plan clear enough to build from. She does not do demolition, plumbing, or tile work. That separation is the point: you get a designer's eye on the room and keep the trades you already trust to build it.
Yes, that is the usual arrangement. Julia designs the bathroom and gives your contractor or tile setter the layout, the tile plan, the fixture and hardware selections, and the finish details they need. She is happy to answer their questions during the build. You keep your trades, they get a clear plan to follow, and the room comes out designed rather than defaulted.
A remodeler builds the bathroom: demolition, plumbing, framing, tile, and installation. A bathroom interior designer decides what gets built and how it looks, the layout and flow, which tile goes where, the vanity and its finish, the lighting plan, and the fixtures and hardware. Most remodelers will build exactly what you hand them and make few of those design decisions for you. The designer is the layer that makes those choices deliberate instead of leaving them to a showroom or a default.
Greater Philadelphia, including Montgomery County, Bucks County, the Main Line, Chester County and West Chester, Philadelphia, and South Jersey. In-home walkthroughs from the Huntingdon Valley studio.
Ninety minutes in your home, a written plan in 48 hours, $350 to $500. If you do not leave with clarity, you do not pay. Serving Greater Philadelphia.